Contents
Your question in detail?

A senior-led conversation gets to the heart of your situation.

Yes, Business Central handles lot traceability in the standard: via item tracking codes you define per item whether lot numbers, serial numbers or both are kept, with expiration date, warranty date and mandatory entry at posting. The numbers travel through purchasing, production, warehouse, transfer and sales, and item tracing shows backwards where a lot came from and forwards which customers it went to. For a recall that is the decisive question, and it is answered in minutes if the postings are clean. It gets tight with quality inspection with inspection plans, with labels and scanners, and with lots that run across several entities.

What item tracking covers in the standard

  • Chargen- und Seriennummern je Artikel, gesteuert über Artikelverfolgungscodes: ob eine Nummer beim Einkauf, bei der Produktion, im Lager oder beim Verkauf Pflicht ist, legen Sie je Artikel fest, nicht global.
  • Ablauf- und Garantiedaten an der Charge, mit Kommissionierung nach dem frühesten Ablaufdatum (FEFO) an Lagerorten mit Lagerplätzen.
  • Durchgängigkeit: Die Nummer läuft vom Wareneingang über Umlagerung, Produktionsverbrauch und Ausbringung bis zur Lieferung mit, jede Buchung trägt sie.
  • Artikelverfolgung vorwärts und rückwärts: Von einer Lieferantencharge zu allen Kunden, die davon erhalten haben, und von einer Kundenreklamation zurück zum Lieferanten und zum Produktionsauftrag.
  • Inventur und Lagerplätze mit Chargen, inklusive Sperren einzelner Chargen für Verkauf oder Verbrauch.

For a recall that is the decisive capability: which customers received goods from lot X, and where did the material come from? In Business Central that is a query, not a project week, provided the numbers were actually captured at posting. That is exactly where the value is decided.

Where the standard ends

Three limits matter in practice. First, quality inspection: inspection plans, measured values, release after inspection and quarantine stock with a reason are not delivered by the standard; there are apps on the Microsoft marketplace for that which build on item tracking. Second, labels and scanners: printing lot labels and mobile capture in the warehouse come via apps or the partner, not out of the box. Third, several entities: if a lot runs from the production company through the sales company to the customer, the number has to be passed on consistently through intercompany documents; how to set that up is in Setting up intercompany: the decision belongs at the start.

What has to be decided before the implementation

  • Which items are tracked at all. Tracking everything creates capture effort without benefit; tracking nothing turns the recall into manual work.
  • The numbering logic: own lot numbers or those of the supplier, format, merging when repacking.
  • Pflicht beim Buchen, und zwar wirklich: Eine Charge, die „später nachgetragen“ wird, fehlt im Ernstfall. Die Erfassung gehört in den Wareneingang und in die Produktionsrückmeldung, mit Scanner, wo das Volumen es verlangt.
  • Clean item master data before the migration, because tracking builds on item numbers and units. How to measure that is in Cleansing master data before the ERP migration.
  • A rehearsed recall: run through once before go-live, from the complaint to the customer list, with timing.

Who this is relevant for

Food and feed, pharma and medical technology, chemicals, cosmetics and every manufacturer with traceability obligations or customer audits. The same applies to agricultural trade with seed, fertiliser and crop protection; what else counts there is in What matters when choosing an ERP in agricultural trade? If your manufacturing goes deeper than lots, for example with variants, project manufacturing or multi-level BOMs, read Business Central for complex manufacturing.

Quellen: Microsoft Learn: Work with serial, lot, and package numbers, Microsoft Learn: Trace item-tracked items

Briefly asked

Can Business Central keep lot and serial numbers at the same time?

Yes. The item tracking code defines per item whether lot number, serial number or both are kept and at which postings the entry is mandatory.

Does Business Central support FEFO, meaning picking by expiration date?

Ja, über Ablaufdaten an der Charge und die Einstellung „Kommissionierung nach FEFO“ am Lagerort. Voraussetzung sind Lagerplätze und Artikelverfolgung mit Ablaufdatum.

Do we need an add-on for traceability?

Not for traceability itself; the standard covers capture, flow and tracing. Add-ons from the Microsoft marketplace are usually needed for quality inspection with inspection plans, label printing and mobile scanner capture.

The bigger picture: Business Central for complex manufacturing

Related

Related questions

Industries

Which ERP suits an automotive supplier?

Delivery schedules, labelling and traceability come from your customers.

21.09.2026

Read →

Industries

What matters when choosing an ERP in agricultural trade?

The price is not yet fixed on delivery. What that means for the selection.

23.09.2026

Read →

Industries

Business Central in mechanical engineering: what really matters

Variants, engineer-to-order, intercompany: what mechanical engineering demands of an ERP.

28.08.2026

Read →

Where does your project really stand?

At DGP you speak with an experienced consultant, not with a sales team.

Senior-led advisory conversation on Business Central and ERP at DGP

Lot traceability in Business Central: what the standard can do, and where it gets tight

Business Central tracks lots, serial numbers and expiration dates in the standard via item tracking, from goods receipt to shipment. What is missing is less function than discipline in master data and postings.

Frank Maier·Last updated: 05.11.2026

Contents
Your question in detail?

A senior-led conversation gets to the heart of your situation.

Yes, Business Central handles lot traceability in the standard: via item tracking codes you define per item whether lot numbers, serial numbers or both are kept, with expiration date, warranty date and mandatory entry at posting. The numbers travel through purchasing, production, warehouse, transfer and sales, and item tracing shows backwards where a lot came from and forwards which customers it went to. For a recall that is the decisive question, and it is answered in minutes if the postings are clean. It gets tight with quality inspection with inspection plans, with labels and scanners, and with lots that run across several entities.

What item tracking covers in the standard

  • Chargen- und Seriennummern je Artikel, gesteuert über Artikelverfolgungscodes: ob eine Nummer beim Einkauf, bei der Produktion, im Lager oder beim Verkauf Pflicht ist, legen Sie je Artikel fest, nicht global.
  • Ablauf- und Garantiedaten an der Charge, mit Kommissionierung nach dem frühesten Ablaufdatum (FEFO) an Lagerorten mit Lagerplätzen.
  • Durchgängigkeit: Die Nummer läuft vom Wareneingang über Umlagerung, Produktionsverbrauch und Ausbringung bis zur Lieferung mit, jede Buchung trägt sie.
  • Artikelverfolgung vorwärts und rückwärts: Von einer Lieferantencharge zu allen Kunden, die davon erhalten haben, und von einer Kundenreklamation zurück zum Lieferanten und zum Produktionsauftrag.
  • Inventur und Lagerplätze mit Chargen, inklusive Sperren einzelner Chargen für Verkauf oder Verbrauch.

For a recall that is the decisive capability: which customers received goods from lot X, and where did the material come from? In Business Central that is a query, not a project week, provided the numbers were actually captured at posting. That is exactly where the value is decided.

Where the standard ends

Three limits matter in practice. First, quality inspection: inspection plans, measured values, release after inspection and quarantine stock with a reason are not delivered by the standard; there are apps on the Microsoft marketplace for that which build on item tracking. Second, labels and scanners: printing lot labels and mobile capture in the warehouse come via apps or the partner, not out of the box. Third, several entities: if a lot runs from the production company through the sales company to the customer, the number has to be passed on consistently through intercompany documents; how to set that up is in Setting up intercompany: the decision belongs at the start.

What has to be decided before the implementation

  • Which items are tracked at all. Tracking everything creates capture effort without benefit; tracking nothing turns the recall into manual work.
  • The numbering logic: own lot numbers or those of the supplier, format, merging when repacking.
  • Pflicht beim Buchen, und zwar wirklich: Eine Charge, die „später nachgetragen“ wird, fehlt im Ernstfall. Die Erfassung gehört in den Wareneingang und in die Produktionsrückmeldung, mit Scanner, wo das Volumen es verlangt.
  • Clean item master data before the migration, because tracking builds on item numbers and units. How to measure that is in Cleansing master data before the ERP migration.
  • A rehearsed recall: run through once before go-live, from the complaint to the customer list, with timing.

Who this is relevant for

Food and feed, pharma and medical technology, chemicals, cosmetics and every manufacturer with traceability obligations or customer audits. The same applies to agricultural trade with seed, fertiliser and crop protection; what else counts there is in What matters when choosing an ERP in agricultural trade? If your manufacturing goes deeper than lots, for example with variants, project manufacturing or multi-level BOMs, read Business Central for complex manufacturing.

Quellen: Microsoft Learn: Work with serial, lot, and package numbers, Microsoft Learn: Trace item-tracked items

Briefly asked

Can Business Central keep lot and serial numbers at the same time?

Yes. The item tracking code defines per item whether lot number, serial number or both are kept and at which postings the entry is mandatory.

Does Business Central support FEFO, meaning picking by expiration date?

Ja, über Ablaufdaten an der Charge und die Einstellung „Kommissionierung nach FEFO“ am Lagerort. Voraussetzung sind Lagerplätze und Artikelverfolgung mit Ablaufdatum.

Do we need an add-on for traceability?

Not for traceability itself; the standard covers capture, flow and tracing. Add-ons from the Microsoft marketplace are usually needed for quality inspection with inspection plans, label printing and mobile scanner capture.

The bigger picture: Business Central for complex manufacturing

Related

Related questions

Industries

Which ERP suits an automotive supplier?

Delivery schedules, labelling and traceability come from your customers.

21.09.2026

Read →

Industries

What matters when choosing an ERP in agricultural trade?

The price is not yet fixed on delivery. What that means for the selection.

23.09.2026

Read →

Industries

Business Central in mechanical engineering: what really matters

Variants, engineer-to-order, intercompany: what mechanical engineering demands of an ERP.

28.08.2026

Read →

Where does your project really stand?

At DGP you speak with an experienced consultant, not with a sales team.

Invitations by email

Stay on top of things without tracking everything yourself.

Once a month, Frank Maier puts into context what is moving in the ERP world. Plus the invitation to the next live webinar.

Thank you, you are signed up.